Fast, Flexible Security for a Refurbishment Project in the Capital
A leading London property developer needed urgent boarding and access security for their Marsh Wall property during refurbishment.
They required robust ground floor window protection, a secure temporary metal door, and, at the last minute, removal of timber hoarding that was blocking access to a vital plant room.
Propertysec acted quickly, tailoring the solution on-site and completing all work within the agreed timeframe, keeping the property safe, accessible, and protected against theft or vandalism.
Project Overview
Client: Leading London property developer
Location: Marsh Wall, London, UK
Scope: Boarding for ground floor windows, secure temporary metal door, removal of timber hoarding
Installation Time: Single visit
Goal: Secure property during refurbishment while maintaining site accessibility
Background
The Marsh Wall property was undergoing major refurbishment, creating a window of opportunity for theft, vandalism, and unauthorised entry.The developer needed a vacant property security solution that could be installed quickly without disrupting the project schedule.
The Challenge
Urgent requirement to secure all ground floor windows
Need for a durable, lockable metal temporary door
Unexpected request to remove timber hoarding to allow plant room access
Delivering all works without delaying refurbishment progress
Our Solution
Ground Floor Boarding
Custom-measured perforated steel security screens installed across all vulnerable window openings, deterring intruders while allowing airflow and visibility.
Secure Temporary Metal Door
Heavy-duty, lockable steel door fitted for controlled access during refurbishment.
On-the-Spot Adaptability
Responded to last-minute client request to remove obstructive timber hoarding at no additional cost, showing flexibility and commitment to client needs.
Execution and Timeline
Arranged site visit to assess requirements and take measurements
Delivered and installed all boarding and the metal door in a single scheduled visit
Removed hoarding during the same visit to maintain project efficiency
Results and Impact
Full property security achieved during refurbishment period
Improved site accessibility with hoarding removed
Client praised the fast turnaround, professionalism, and flexibility
No delays to refurbishment schedule
“Propertysec handled everything we needed, even the last-minute changes without hesitation. The service was professional, quick, and exactly what we required.” — Property owner
What This Case Proves
Quick action and flexibility are essential in refurbishment security projects
Combining robust boarding with controlled access points ensures maximum protection
Client-focused service helps maintain trust and ongoing relationships
Need Temporary Security During Refurbishment?
We can secure your site quickly with durable boarding, secure access doors, and a flexible approach to on-site challenges.
Contact our team today for a free site survey.
Why Choose Propertysec?
Securing vacant or high-risk properties isn’t just something we do, it is what we specialise in.
Here’s why professionals across the UK trust us:
-
Proven track record with property professionals
-
Nationwide deployment within 24–48 hours
-
Specialist expertise in vacant and high-risk properties
-
Reliable, insurance-compliant technology
-
Trusted by leading commercial, residential, and public sector clients.
