Fast, Safe, and Cost-Effective Boarding for Large Vacant Sites
In this case study, we explore how Propertysec secured a large, glass-fronted former UPS building in Feltham using an off-site fabrication approach.
By cutting and preparing 400 perforated steel sheets in advance, our team reduced on-site installation time, enhanced safety, and delivered one of the most cost-effective vacant building security solutions in the UK.
Project Overview
Client: Confidential
Location: Feltham, UK
Scope: Nearly 400 perforated steel sheets, pre-cut via off-site fabrication
Installation Time: Rapid installation following off-site preparation
Goal: Secure a large vacant building quickly, safely, and cost-effectively
Background
The former UPS building, with its extensive glass frontage, stood vacant and vulnerable to squatters, thieves, and vandals.The property owner needed immediate protection that could be deployed without long on-site steel sheets cutting times or safety risks.
The Challenge
Scale: Nearly 400 steel sheets required for complete coverage
Urgency: Quick turnaround to prevent break-ins and squatting
Budget: Must be cost-effective without compromising on quality
Safety: Cutting metal sheets on-site posed significant hazards to workers and environmental damage.
Our Solution
Off-Site Metal Fabrication Advantage
Thanks to our 80,000 sq ft fabrication facility, all perforated steel sheets were cut to exact size before arriving on-site.
This approach:
Reduced on-site installation time
Eliminated risks from on-site metal cutting
Lowered overall project costs
Precision Steel Boarding Installation
Our team used the pre-cut steel sheets to secure every vulnerable opening, creating a robust barrier against intrusion while maintaining a professional appearance.
Execution and Timeline
Conducted site survey and precise measurements
Fabricated all panels off-site in a controlled environment
Transported and installed the metal sheets quickly and safely
Completed the boarding up project within the required deadline, without incident
Results and Impact
Prompt completion minimised risk of illegal occupation
Enhanced security across all access points
Cost-effective delivery thanks to fabrication efficiencies
Client praised the speed, professionalism, and quality of work
“The speed and safety of the installation were impressive. Propertysec’s off-site fabrication made all the difference in securing the building quickly and cost-effectively.” — Client Representative
What This Case Proves
Off-site fabrication saves time, money, and improves safety
Large-scale vacant buildings can be secured without disruption
Collaboration with in-house fabrication facilities ensures quality control
Need Large-Scale Steel Boarding for Your Vacant Building?
Contact Propertysec today for a free site survey and learn how our off-site fabrication approach can secure your property fast.
Why Choose Propertysec?
Securing vacant or high-risk properties isn’t just something we do, it is what we specialise in.
Here’s why professionals across the UK trust us:
-
Proven track record with property professionals
-
Nationwide deployment within 24–48 hours
-
Specialist expertise in vacant and high-risk properties
-
Reliable, insurance-compliant technology
-
Trusted by leading commercial, residential, and public sector clients.





