top of page

Fast, Safe Boarding Solution for a Large Vacant UPS Building in Feltham

Fast, Safe, and Cost-Effective Boarding for Large Vacant Sites


In this case study, we explore how Propertysec secured a large, glass-fronted former UPS building in Feltham using an off-site fabrication approach.

By cutting and preparing 400 perforated steel sheets in advance, our team reduced on-site installation time, enhanced safety, and delivered one of the most cost-effective vacant building security solutions in the UK.

Project Overview


Client: Confidential

Location: Feltham, UK

Scope: Nearly 400 perforated steel sheets, pre-cut via off-site fabrication

Installation Time: Rapid installation following off-site preparation

Goal: Secure a large vacant building quickly, safely, and cost-effectively


Background


The former UPS building, with its extensive glass frontage, stood vacant and vulnerable to squatters, thieves, and vandals.The property owner needed immediate protection that could be deployed without long on-site steel sheets cutting times or safety risks.


The Challenge


  • Scale: Nearly 400 steel sheets required for complete coverage

  • Urgency: Quick turnaround to prevent break-ins and squatting

  • Budget: Must be cost-effective without compromising on quality

  • Safety: Cutting metal sheets on-site posed significant hazards to workers and environmental damage.


Our Solution


Off-Site Metal Fabrication Advantage


Thanks to our 80,000 sq ft fabrication facility, all perforated steel sheets were cut to exact size before arriving on-site.


This approach:


  • Reduced on-site installation time

  • Eliminated risks from on-site metal cutting

  • Lowered overall project costs


Precision Steel Boarding Installation


Our team used the pre-cut steel sheets to secure every vulnerable opening, creating a robust barrier against intrusion while maintaining a professional appearance.


Execution and Timeline


  • Conducted site survey and precise measurements

  • Fabricated all panels off-site in a controlled environment

  • Transported and installed the metal sheets quickly and safely

  • Completed the boarding up project within the required deadline, without incident


Results and Impact


  • Prompt completion minimised risk of illegal occupation

  • Enhanced security across all access points

  • Cost-effective delivery thanks to fabrication efficiencies

  • Client praised the speed, professionalism, and quality of work


“The speed and safety of the installation were impressive. Propertysec’s off-site fabrication made all the difference in securing the building quickly and cost-effectively.” — Client Representative

What This Case Proves


  • Off-site fabrication saves time, money, and improves safety

  • Large-scale vacant buildings can be secured without disruption

  • Collaboration with in-house fabrication facilities ensures quality control


Need Large-Scale Steel Boarding for Your Vacant Building?


Contact Propertysec today for a free site survey and learn how our off-site fabrication approach can secure your property fast.

Why Choose Propertysec?

Securing vacant or high-risk properties isn’t just something we do, it is what we specialise in.

 

Here’s why professionals across the UK trust us:

 

  • Proven track record with property professionals

  • Nationwide deployment within 24–48 hours

  • Specialist expertise in vacant and high-risk properties

  • Reliable, insurance-compliant technology

  • Trusted by leading commercial, residential, and public sector clients.

SentinelV
bottom of page